Home » Dissertations » Masonry arch bridge dissertation writing

Masonry arch bridge dissertation writing

Masonry arch bridge dissertation writing beams and arches predominate

Our Guarantees Our Quality Standards Our Fair Use Policy

What Makes UK Essays Different?

  • We have a verifiable trading history as a UK registered company (details at the bottom of every page).
  • Our Nottingham offices are open to the public where you can meet our team of over 40 full-time staff.
  • UK Essays partner with Feefo.com to publish verified customer testimonials – both good and bad!

Ask an Expert FREE

Ask an Expert Index Ask a Question Paid Services

About Our Ask an Expert Service

Our totally free “Ask an Expert” Service allows users to get an answer of up to 300 words to any academic question.

  • Questions typically answered within 24 hours.
  • All answers are researched and written by fully qualified academics in the question’s subject area.
  • Our service is completely confidential, only the answer is published – we never publish your personal details.
  • Each professional answer comes with appropriate references.

About Us

More About Us

Published: 23, March 2015

CHAPTER 2

The first bridges were made by nature itself – as simple as a log fallen across a stream. The first bridges made by humans were probably spans of wooden logs or planks and eventually stones, using a simple support and crossbeam arrangement. Some early Americans used trees or bamboo poles to cross small caverns or wells to get from one place to another.

Figure 2.1 the The three Span Concrete claghorn bridge over blacklick creek

Some of the earliest surviving bridges date from around the second Century BC. Typically, they were stone arches, a form that dominated bridge construction until the arrival of wrought iron and steel in the early 18th Century and, 150 years later, concrete.

Masonry arch bridge dissertation writing or wells to get

Most bridges were built by the church and two Renaissance stone bridges can still be seen in Paris – the Pont Notre Dame (1305) and the Pont Neuf (1606). It was in the 18th Century that bridge design began to develop into a science, led by an engineering school founded in Paris. Its director, Jean Perronet, perfected the masonry arch, with its low sweeping curve and slender piers. Soon afterwards, attention switched to England where the invention of the steam locomotive called for stronger bridges. In 1794, iron was first used for the chain cables of a suspension bridge over the River Tees and 1779 saw the first all-iron bridge over the Severn at Coalbrookdale. This arch bridge, spanning 100ft, is still in service.

Professional

Get your grade
or your money back
using our Essay Writing Service!

Essay Writing Service

Just when the masonry arch bridge was reaching its peak around the beginning of the 20th Century, reinforced concrete arrived on the scene. Since then, it has become the major construction material for bridges as it has for most structural and civil engineering applications, with its intrinsic versatility, design flexibility and, above all, natural durability. Although several British engineers had been using concrete early in the 19th Century, its use in British bridges did not develop until the latter half of the 20th Century. It is estimated that at least 75% of the Highways Agency concrete bridge stock has been built since 1960.

The earliest known example of a mass concrete bridge in the UK, using lime concrete, was on the District Line, near Cromwell Road, West London, designed by Thomas Marr Johnson for Sir John Fowler and built c.1865.

Masonry arch bridge dissertation writing An analytical study of

Other British engineers began to use plain concrete for bridge superstructures, notably Philip Brannan, who erected a three-span concrete arch, including a 50ft middle span, at Seaton in Devon in 1877. The use of reinforced concrete probably started with the Homersfield Bridge over the River Waveney on the Norfolk/Suffolk border in 1870, when iron was embedded in concrete, but it was not until the first decade of the 20th Century that reinforcement, as we know it today, was introduced. This was due almost entirely to L.G. Mouchel, the UK agents for the Hennebique system. The first project in the UK was an 18ft span bridge at Chewton Glen in Hampshire in 1902, followed two years later by a 40ft span beam and slab bridge at Sutton Drain in Hull.

The three bridges circa 1928, the Royal Tweed Bridge is almost ready for opening (middle)

By 1930 there were about 2000 reinforced concrete bridges in UK and notable designers such as Sir Owen Williams emerged between the two World Wars e.g. Montrose (1930). Other major bridges of this period were the Royal Tweed Bridge, Berwick (Mouchel); Chiswick and Twickenham River Thames Bridges (Considere); King George V Bridge, Glasgow and, possibly the best of the period, Waterloo Bridge, London. The outstanding feature of concrete bridges both during and after the Second World War was the advent of prestressed concrete, used to rebuild the many bridges that had been destroyed, especially on the Continent.

By 1950, bridges by Freyssinet and Magnel had been built, using precast segments joined by concrete or mortar; Finsterwalder had constructed the first in-situ box girder bridge using cantilever construction and in the 1960s, the first incrementally launched bridge was built in Germany. Reinforced concrete was still being used in the 1950s for larger bridges, especially arches, notably Lune Bridge carrying the M6, but by the end of the 1960s, prestressed concrete had largely superseded reinforced concrete with box girders being the dominant structural form.

Comprehensive

Plagiarism-free
Always on Time
Marked to Standard

Expansion of the motorway network demanded large numbers of concrete bridges, a functional and cost-effective solution to society’s needs. The main emphasis on bridge design became economy and durability rather than style. This inspired any number of developments and construction techniques, mainly involving precast segmental. The durability of concrete has also been recognised by its significant use on major estuarial crossings. Design and construction techniques continue to evolve to satisfy the increasing demands of the UK transport network e.g. integral bridges.

Hangzhou Bay Bridge (China): World’s Longest Trans-Oceanic Bridge

2.2 Loads on bridges

2.3 Type of bridges

There are six main types of bridges: beam bridges, cantilever bridges, arch bridges, suspension bridges, cable-stayed bridges and truss bridges.

Beam bridges are horizontal beams supported at each end by piers. The earliest beam bridges were simple logs that sat across streams and similar simple structures. In modern times, beam bridges are large box steel girder bridges. Weight on top of the beam pushes straight down on the piers at either end of the bridge

Cantilever bridges are built using cantilevers-horizontal beams that are supported on only one end. Most cantilever bridges use two cantilever arms extending from opposite sides of the obstacle to be crossed, meeting at the centre

Arch bridges are arch-shaped and have abutments at each end. The earliest known arch bridges were built by the Greeks and include the Arkadiko Bridge. The weight of the bridge is thrust into the abutments at either side

Suspension bridges are suspended from cables. The earliest suspension bridges were made of ropes or vines covered with pieces of bamboo. In modern bridges, the cables hang from towers that are attached to caissons or cofferdams. The caissons or cofferdams are implanted deep into the floor of a lake or river

Like suspension bridges, cable-stayed bridges are held up by cables. However, in a cable-stayed bridge, less cable is required and the towers holding the cables are proportionately shorter

Truss bridges are composed of connected elements. They have a solid deck and a lattice of pin-jointed or gusset-joined girders for the sides. Early truss bridges were made of wood, and later of wood with iron tensile rods, but modern truss bridges are made completely of metals such as wrought iron and steel or sometimes of reinforced concrete.

2.4 General description of a bridge type

The four main factors are used in describing a bridge. By combining these terms one may give a general description of most bridge types.

span (simple, continuous, cantilever),

placement of the travel surface in relation to the structure (deck, pony, through),

Material (stone, concrete, metal, etc.),

Form (beam, arch, truss, etc.).

2.4.1 Span

The three basic types of spans are shown below. Any of these spans may be constructed using beams, girders or trusses. Arch bridges are either simple or continuous (hinged). A cantilever bridge may also include a suspended span.

2.4.2 Placement

In a Deck configuration, traffic travels on top of the main structure; in a Pony configuration, traffic travels between parallel superstructures which are not cross-braced at the top; in a Through configuration, traffic travels through the superstructure (usually a truss) which is cross-braced above and below the traffic.

2.4.3 Material

2.4.3.1 Reinforced and Prestressed Concrete

Concrete is an all-round construction material. Almost every building contains some concrete. Concrete is poured into forms as a stiff but workable mix, and it can be given any shape; this is an advantage and a danger. The construction of good durable concrete requires special know-how – which the bridge engineer is assumed to have. Good concrete attains high compressive strength and resistance against most natural attacks though not against de-icing saltwater, or CO2 and SO2 in polluted air.

The steel bars only really come into play after the concrete cracks under tensile stresses. If the reinforcing bars are correctly designed and placed, then these cracks remain as fine hair cracks and are harmless. A second method of resisting tensile forces in concrete structures is by prestressing. Prestressed concrete revolutionized the design and construction of bridges in the fifties. With prestressed concrete, beams could be made more slender and span considerably greater distances than with reinforced concrete. Prestressed concrete – if correctly designed – also has a high fatigue strength under the heaviest traffic loads. Prestressed concrete bridges soon became much cheaper than steel bridges, and they need almost no maintenance – again assuming that they are well designed and constructed and not exposed to de-icing salt. So as from the fifties prestressed concrete came well to the fore in the design of bridges.

This Essay is

This essay has been submitted by a student. This is not an example of the work written by our professional essay writers.

Examples of our work

All types of structures can be built with reinforced and prestressed concrete: In bridge building, concrete beams and arches predominate. The shaping of concrete is usually governed by the wish to use formwork which is simple to make. Plain surfaces, parallel edges and constant thickness are preferred. This gives a stiff appearance to concrete bridges, and avoiding this is one task of good aesthetic design.

There is one great disadvantage to concrete as it emerges from the forms: the inexpressive, dull grey colour of the cement skin. The surfaces frequently show stains, irregular streaks from placing the concrete in varying layers, and pores or even cavities from deficient compaction, which ire then patched more or less successfully. These deficiencies have lead to a widespread aversion to concrete, As well as to efforts for improvement. Some of the methods used to achieve a good concrete finish in buildings, like profiles and patterns on the formwork, ribs or accentuated timber veins etc are not generally suitable for bridges.

The best effect is obtained by bush hammering as was usual between 1934 and 1945 for the bridges of the German autobahn system. The concrete coating of the rein- forcement is increased by 10 to 15 mm, so that a thin layer together with the cement skin can be taken off by fine or coarse bush hammering. The aggregate is then exposed with its structure and colour.

2.4.3.2 New materials

Concrete design specifications have in the past focused primarily on the compressive strength. Concrete is slowly moving toward an engineered material whose direct performance can be altered by the designer. Material properties such as permeability, ductility, freeze-thaw resistance, durability, abrasion resistance, reactivity, and strength will be specified. The HPC (high performance concrete) initiative has gone a long way in promoting these specifications, but much more can be done. Additives, such a fibers or chemicals, can significantly alter the basic properties of concrete. Other new materials, such as fiber-reinforced polymer composites, nonmetallic reinforcement (glass fiber-reinforced and carbon fiber-reinforced plastic, etc.), new metallic reinforcements, or high-strength steel reinforcement can also be used to enhance the performance of what is considered to be a traditional material. Higher strength reinforcement could be particularly useful when coupled with high-strength concrete. As our natural resources diminish, alternative aggregate sources (e.g. recycled aggregate) and further replacements of cementitious materials with recycled products are being examined. Highly reactive cements and reactive aggregates will be concerns of the past as new materials with long-term durability become commonplace. New materials will also find increasing demand in repair and retrofitting. As the bridge inventory continues to get older, increasing the usable life of structures will become critical. Some innovative materials, although not economical for complete bridges, will find their niche in retrofit and repair.

Figure Wrapping of carbon fibre sheet (a) pasting glue (b) wrapping the first layer

(c) bonding on the first layer

2.4.4 Decks

The most common type of concrete deck, by far, is the Cast-in-place (CIP). Their main advantage is the ability to provide a smooth riding surface by field-adjustment of the roadway profile during concrete placement. In recent years automation of concrete placement and finishing has made this system cost-effective. However, CIP slabs have disadvantages that include excessive differential shrinkage with the supporting beams and slow construction. Recent innovations in bridge decks have focused on improvement to current practice with CIP decks and development of alternative systems that are cost-competitive, fast to construct, and durable. Focus has been on developing mixes and curing methods that produce performance characteristics such as freeze-thaw resistance, high abrasion resistance, low stiffness, and low shrinkage, rather than high strength. Full-depth precast panels have the advantages of significant reduction of shrinkage effects and increased construction speed and have been used in states with high traffic volumes for deck replacement projects.

Several countries use stay-in-place (SIP) precast prestressed panels combined with CIP topping for new structures as well as for deck replacement. This system is cost-competitive with CIP decks. The SIP panels act as forms for the topping concrete and also as part of the structural depth of the deck. This system can significantly reduce construction time because field forming is only needed for the exterior girder overhangs. The SIP panel system suffers from reflective cracking, which commonly appears over the panel-to-panel joints. A modified SIP precast panel system has recently been developed in NCHRP Project 12-41.

2.5 section shapes

2.5.1 Column section shapes

The figure illustrates different possible section shape for reinforced concrete columns of bridge piers. The principal choice will be between circular and rectangular solid sections.

Sections A-A and B-B represent the common choice of columns with a circular distribution of longitudinal reinforcement contained within transverse reinforcement in the form of circular hoops or spirals. These sections are efficient, economical and easy to construct. The continuous curve of the transverse reinforcement results in excellent confinement of the core concrete and also provides effective constraint against buckling of the longitudinal flexural reinforcement. Section strength and displacement capacity are independent of direction of seismic response.

Section C-C the circular longitudinal reinforcements have been supplemented by additional reinforcement in the flare region. It is with monolithic superstructure designs and common to flare the top of the column to provide better support to the cap beam under eccentric live-load and also to improve aesthetics.

Section D-D has only peripheral hoop reinforcement, which is ineffective in confining the core concrete and in providing restraint against longitudinal bar buckling, and hence should never be used when ductile response is required of the pier. Providing adequate confinement using rectangular hoops, as is common in building columns.

Section E-E is possible for only comparatively small bridge columns.

Section F-F is common for large rectangular columns.semi- circular ends, or large chamfers are used to avoid excessive cover, with consequent potential spalling problems and to reduce sensitivity to diagonal attack. The spirals must overlap by a sufficient amount to ensure that shear strength is not compromised. When longitudinal response of a bridge with comparatively few spans is resisted principally by abutments, an elongated rectangular pier section shown in the fig. 26, Section G-G may be adopted. In the transverse direction, these sections act as structural walls, with high strength and stiffness, but in the longitudinal directions they have low stiffness, thus attracting little seismic force.

2.5.2 Superstructure Section shapes

Solid and voided slabs are appropriate for short span bridges, with spans below 15 m. the inverted T section is also used for short span bridges, with spans below 25 m. Typically an in situ deck is cast on the inverted T units, using shear connections between these units and situ slabs. The I beam is a common section for short span bridges. The double T section is used in the lower end of the medium-span range(25 to 35 m). However, this section is not suitable for bridges curved in the horizontal plane because of poor torsional characteristics.

Box girders have the advantage of having high stiffness and strength for minimum weight, and also high torsional characteristics. This last feature makes the sections suited for bridges curved in the horizontal plane.

Request Removal

If you are the original writer of this essay and no longer wish to have the essay published on the UK Essays website then please click on the link below to request removal:

More from UK Essays

Fiscal year 2012

Doctoral thesis

  • Md. Robiul Awall
    Dynamic behavior of horizontally curved twin I-girder bridges under moving vehicles
  • Hiroki SAKURABA
    Study on deformation behaviors and ultimate section forces of CFRP beams with different laminate structures

Master’s thesis

  • Akihiro NISHIDA
    Study on damage attribution analysis of bridges in Sapporo
  • Kento YOSHINO
    Study on Seismic Response of Curved Grillage Girder Viaduct with Integrated Sliding Bearings
  • Takayuki MIENO
    Study on the failure load and deformation of CFRP beams based on the fracture of individual laminae
  • Hayato FUJITA
    Heat conduction analysis of steel-concrete composite slabs under freeze-thaw environment

Graduate’s thesis

  • Kotaro ENOMOTO
    Study on the flexural behaviors of CFRP beams with different shear spans
  • Nami OTAKI
    Analytical study on the effect of UHPFRC overlay reinforcement on an RC slab
  • Yoshitsugu KATASE
    Numerical analysis and reinforcement effect evaluation on seismic response of railway viaducts considering dynamic train load
  • Masakazu SATO
    Field vibration test and structure identification of wooden pedestrian deck arch bridge
  • Yuki TAKEDA
    Measurement of deformation behaviors of an RC slab in a highway bridge and evaluation of its damage level

Fiscal year 2011

Doctoral thesis

  • Mikio TAKEUCHI
    Study on measures against earthquake for underground structures
  • Shogo ARAKI
    Study on structural rationalization and establishment of design method for timber-concrete composite girder bridge
  • Ko KAKUMA
    Evaluation of Fatigue Durability of Steel Plate Deck with ECC Reinforcement Based on Micromechanics

Master’s thesis

  • Shinya OTA
    Numerical evaluation on dynamic response charastaristics of twin I-girder bridges subjected to moving vehicles
  • Hirotada OKAMATSU
    Study on the Deformation and Damage Processes of Web Part of CFRP Beams by Image Analysis
  • Yusuke KAHO
    Analytical study on the influence of adhesion characteristics of rebars on fatigue degradation of RC decks
  • Akihito SHIRAKI
    Finite element analysis on the bending behavior of a trapezoidal section CFRP girder
  • Takahiko SUZAKI
    Study on the structure identification of wooden pedestrian bridges using GA
  • Yusuke FURUYASHIKI
    Nonlinear Seismic Response of Tower of Cable-Stayed Bridge in Consideration of Residual Stress
  • Yoshitsugu NAKAGAWA
    Effect of Steel Dampers on Dynamic Response of Curved Highway Viaducts under Great Earthquake Motions

Graduate’s thesis

  • Naoya SHIRAHATA
    Nonlinear dynamic response of straight viaduct system under level II earthquakes with Shock- Absorbing Device made of rubber
  • Toshiya SUZUKI
    FEM analysis on the fatigue of RC bridge deck slabs with simulated freeze-thaw damage
  • Takuma SHIMADA
    Influence of Bearing and Pier Height on Nonlinier Dynamic Response of 3-span Curved Viaduct under Great Earthquake
  • Shoichi IIJIMA
    Seismic Response Analysis of Curved Highway Viaducts with Limited Movement of Roller Bearings
  • Hikaru HISASHI
    Seismic response evaluation of railway viaducts considering dynamic effect of train load
  • Toshihiko HOSOKAWA
    A damage detection approach using traffic-induced vibration response of railway viaducts

Fiscal year 2010

Master’s thesis

  • Yasuhide NODA
    Dynamic analyses on coupled vibration of curved twin I-girder bridges and running vehicles
  • Toshiya TANAKA
    Study on Nonlinear Seismic Response of Steel Tower of Cable-Stayed Bridge
  • Atsushi FUKUSHIMA
    Study on bridge design transition and civil engineers in historical background of TOYOHIRA-BASHI
  • Makoto IKEDA
    Finite element analysis on the compression of CFRP box columns with infill materials
  • Masahito TANNO
    Study on Static Behavior of Stone-masonry Arch Bridges

Graduate’s thesis

  • Yoon-Shik OH
    Development of damage identification approach to bridges using traffic-induced vibration analysis and GA
  • Hayato FUJITA
    An analytical study of an ECC link slab for bridge expansion joints
  • Kento YOSHINO
    Seismic Response of 3-span Continuous Girder Viaduct with Base-isolated Bearings
  • Akihiro NISHIDA
    Damage factor of Bridges in Sapporo City
  • Takayuki MIENO
    A study on the failure load estimation of CFRP box beams based on classical lamination theory
  • Takeshi SHIMODA
    Influence of Vehicle Models on Traffic-Induced vibration analyses of curved twin I-girder bridges
  • Kazuki INAGAKI
    A study on the strain measurement accuracy of digital image correlation method
  • Takaya HAYASHI
    Earthquake Response Characteristics of Straight Viaduct System with Shock-Absorbing Device on Girder Edge

Fiscal year 2005

Doctoral thesis

  • Daniel Ruiz Julian
    Seismic Performance of Isolated Curved Highway Viaducts
    with Unseating Prevention Cable Restrainers

Master’s thesis

  • Kenji ABE
    Study on Seismic Response of Curved Grillage Girder Viaduct
    with Base Isolation Bearings
  • Norio ISE
    Study on Seismic Response of Viaducts with Steel Rigid Frame
    and Reduction of Earthquake Forces
  • Masaya ICHIKAWA
    Study on Vibration Characteristics and Structural Performance
    in Curved Twin I-girder Bridges Improved Torsional Stiffness
  • Keisuke FUKUI
    Study on Seismic Response of Cable-stayed Bridge Considering Interaction
    Between Structure and Soil
  • Yusuke YOSHIDA
    Study on Nonlinear Seismic Response of Cable-Stayed Bridge Steel Towers
    Considering Soil-Structure Interaction

Graduate’s thesis

  • Yusuke KASAI
    Study on Damage Identification of Steel Bridge Superstructures
    by Using of Sound Monitoring System
  • Taeksang KIM
    Study on Establishment of BMS in Consideration of Damage Level, Life Expectancy, User Cost
  • Yoshitaro NAKAI
    Nonlinear Dynamic Response of Curved Viaduct System Under Level �U Earthquakes
    in Consideration of Steel Bearing Positions
  • Katsushi NAGATA
    Seismic Response of Steel Tower of Cable-stayed Bridge with Dynamic Interaction
    and Reduction of Earthquake Forces
  • Yutaka YOSHIDA
    Nonlinear Seismic Response of Viaduct with Steel Rigid Frame
    in Consideration of Damaged Members

Fiscal year 2004

Master’s thesis

  • Yasuhiro ASAKA
    Study on Damage Identification of Infrastructures by using Sound & AE Monitoring
  • Ryosuke ONO
    Study on Quantitative Assessment of Lifecycle Environmental Impact
    on Bridge Structures by using of Data Envelopment Analysis
  • Shinya OGAWA
    Study on Dynamic Behavior of Curved Viaduct System
    in consideration of Three-dimensional Earthquake and Bearing Conditions
  • Ryo KURATO
    Study on Life Cycle Management of Infrastructures Based on Reliability Analysis

Graduate’s thesis

  • Junpei KOBATA
    Stress Concentration and Fatigue Assessment
    at the connection of Diagonal Cross Beams in Curved Twin I-girder Bridge
  • Masashi SAITO
    Study on Natural Frequencies and Torsional Stiffness
    in Curved Twin I-Girder Bridges
  • Wataru SAWASAKI
    Study on Non-contact three-Dimensional Displacement Measuring System
    by using Image-processing Technology
  • Ryotaro SHIRAI
    Nonlinear Seismic Response Analysis of Steel Cable-stayed Bridge
    with Seven-span Continuous Stiffening Girder
  • Shigeharu MATSUMOTO
    Study on Load Carrying Capacity of Twin I-girder Bridge under Launching Construction
  • Miku WATANABE
    Study on Establishment of BMS in Consideration of Damage Level,
    Life Expectancy, User Costand The Present Value on Bridge Structures

Fiscal year 2003

Doctoral thesis

  • Shehata E.Abdel Raheem
    Tower Nonlinear Dynamic Response of Cable-stayed Bridges
    under Great Eaethquake Ground Motion
  • Kenji IKEDA
    (title is unknown)
  • Mikiyuki MIZUKAMI
    (title is unknown)
  • Osamu YOSHIDA
    (title is unknown)

Master’s thesis

  • Shunsuke IDA
    Fundamental Study on Estalishmentof BMS in Consideration of Damage Level,
    Life Span and UC of a Bridge Structure
  • Mitsukane KATO
    Research on Aesthetic Elements of Bridges in Historical Background of ASAHIBASHI
  • Takashi KAWAKAMI
    Study on Seismic Response of Steel Tower of Cable-Stayed Bridges
    and Reduction of Earthquake Forces
  • Kosuke SATO
    Study on Local Stress in Curved Twin I-girder Bridges with Diagonal Cross Beams
  • Noriyuki TAKADA
    Study on Quantitative Assessment of Lifecycle Environmental Impact
    on Bridge Structures by using of Data Envelopment Analysis
  • Tsutomu HIROOKA
    Study on Human Walking Force Model
    for Performance-baced design of Pedestrian Bridges
  • Junichi YASUDA
    Study on Nonlinear Seismic Behavior of Steel Cable-stayed Bridge
    with Seven-span Continuous Stiffening Girder

Graduate’s thesis

  • Kenji ABE
    Dynamic Response Analysis of Curved Viaduct System
    in Consideration of Hardening Effect of Base-isolated Bearings
  • Norio ISE
    Nonlinear Seismic Response Analysis of Viaducts
    with Racket Shaped Steel rigid Frame
  • Masaya ICHIKAWA
    Analytical Study on Improvement in Performance of Curved Twin I-girder Bridges
  • Fuminori TAKAHASHI
    Study on Non-contact Multi-point Displacement Measuring System
    by Using Image-processing Technology
  • Keisuke FUKUI
    Nonlinear Dynamic Analysis of Cable-stayed Bridge under Level II Earthquakes
  • Yusuke YOSHIDA
    Nonlinear Seismic Response Analysis of Steel Towers of Cable-stayed Bridge
    with Dynamic Interaction

Laboratory of Bridge and Structural Design Engineering. All rights reserved.


Share this:
custom writing low cost
Order custom writing

ads